Arlington Concrete
(360) 474-2804Get an estimateCall (360) 474-2804

Concrete parking lot building in Arlington WA - a slab that drains and takes the weight

Puddles, broken edges or a gravel lot that ruts every winter? We pour a concrete lot planned around its trucks and its rain.

Wide concrete driveway and landing lead to front steps of a white house, bordered by dark pavers and landscaping stones.

Concrete parking lot building in Arlington, WA starts with knowing a lot isn't a road. Cars turn slowly and park in the same spots, a few lanes carry heavy trucks, and the dumpster pad gets hit on every pickup. When a gravel lot ruts or an old slab holds water, that planning usually got skipped.

So I work out first where the heavy loads go and how rain leaves the surface. The price turns on the lot's size, the base work your ground needs, how thick the slab has to be and the drainage, and the schedule turns on any city review and the weather on pour day. My written estimate says what's in it and what isn't, and if the building beside the lot has settled, ask about foundation raising too.

What our concrete parking lot work covers

  • I come out myself. I walk the site and ask how the lot gets used, then our crew and I do the work and bring in an engineer when a job calls for one.
  • Commercial planning, smaller lots. I spent years pouring lots with a big commercial outfit, then started this business in Arlington in 2023 to bring that planning to smaller properties.
  • A base dug out and packed. We dig down to firm ground and pack the subgrade, the ground the slab sits on, because a slab stays flat only as long as that ground does.
  • Control joints cut on time. We cut control joints, straight grooves that give the slab a place to crack, while the concrete is still young so cracks follow our lines and not their own.
  • Room for people on foot. Lot design guidance says to plan for walkers with crosswalks, grip underfoot and night lighting, so we can broom the surface for traction and set light poles on concrete footings.
  • Licensed and insured for your lot. We're fully licensed and insured, and further down this page you'll find what the state asks of anyone who builds a parking lot here.

What goes wrong with a parking lot

ProblemWhat it looks likeUsual fix
Standing waterWhat it looks like: Puddles that sit for days and freeze into ice patchesUsual fix: Regrade so the surface falls toward a drain
Sinking panelsWhat it looks like: Sections dropped at the edges or along the truck lanesUsual fix: Dig out, rebuild and pack the base, then repour
Cracks everywhereWhat it looks like: Cracks wandering across panels instead of following the jointsUsual fix: Replace the bad panels and cut joints on time
Crushed dumpster padWhat it looks like: Broken, chipped concrete where the garbage truck sets downUsual fix: A thicker pad with rebar, the steel that holds it together
Dusty, worn topWhat it looks like: Powdery surface that chips and scuffs under tiresUsual fix: Clean and seal, or replace panels with a weak top

Repair, replace sections or rebuild

  • Repair and seal. Suits a lot where the slab and base are still sound and the trouble is a few cracks, open joints or stained spots.
  • Replace sections. Suits damage in one area, like a dumpster pad or a sunken lane, where we cut out the bad panels and rebuild the base under them.
  • Full new lot. Suits a lot with water and settling everywhere. If money's tight, I'd trim finish extras before the base, since the base decides how long the lot lasts.

How we plan and build your lot

  1. Call or send the form. Tell us a little about the lot by phone or through the form, and we'll set a time for me to come out.
  2. Site visit and estimate. I walk the site, ask how you'll use the lot, measure, and send a written estimate that says plainly what's in it and what isn't.
  3. Layout and drainage. We settle where the trucks and the dumpster go and how water leaves. If the city wants a drainage report, we work alongside the engineer who stamps it.
  4. Base and pour. Our crew digs out and packs the base, then pours early in the day, because concrete poured in midday heat can end up with a weak, dusty top.
  5. Curing and walk-through. We keep traffic off while the slab cures, the wait while it gains strength, then clean up and walk the finished lot with you.

Keeping a concrete lot sound for years

On a lightly used lot, the wear that matters most usually comes from the cars, because leaked fuel and oil slowly eat at the concrete. Cleaning up drips and resealing joints when they open does more for a lot than anything fancy.

We build for small business owners and homeowners in Arlington and the cities around it, from Everett up into the Skagit Valley and out to Camano. If your city isn't listed, call and ask. When you're ready, call or send the form and I'll come take a look.

Tell us about your lot

Tell us roughly how big the lot is and what parks on it. We reply within one business day and set a time for me to come out.

(360) 474-2804
  • Free estimate on site
  • What's in and what isn't
  • No pressure to book

Parking lot questions we hear

How long does a concrete parking lot last?

A concrete lot designed and built as a lot, not as a road, can give satisfactory service for many years with little maintenance, according to concrete design guidance. When you compare bids, ask each contractor how their plan differs from road paving. Ours starts with the base, the truck lanes and where the water goes.

Do I need a permit for a parking lot in Arlington, WA?

Ask the city first. Arlington's Development Services Division issues the civil development permits codes require, and its list names civil, grading and right of way work rather than parking lots. You can talk a project through with the city at 360-403-3551 or ced@arlingtonwa.gov, and we check what's needed before scheduling and tell you what we'll file and what falls to you.

What is pervious concrete for a parking lot?

Pervious concrete has connected open spaces that let rain soak through the pavement into a drain system below or into the soil. Choosing it changes where the water goes, so it shapes the drainage plan for the whole lot. On a project with a city drainage report, Arlington wants a soil study behind any feature built to soak water into the ground.

Who can build a parking lot in Washington?

A contractor registered with the Washington Department of Labor & Industries, because the state requires every construction contractor to register. State law also requires contractors to be bonded and insured. Ask every contractor you're comparing about both before you sign.

Does Arlington have its own standards for parking lot layout?

Yes. The city's engineering standards include a typical parking layout drawing and a parking lot detail drawing. When we settle your layout, I look at how those drawings bear on your lot, and if you're working with a designer, ask them the same question.

Call about your lot

Mention where the trucks turn, where the dumpster sits and anything the city has asked for, and we'll set a time to come look.

Call(360) 474-2804